Control of heating costs and consumption to over
17,500
costumers of Termokos.

Prior to signing the Threshold agreement, a detailed Constrains Analysis was conducted identifying reliable supply of electricity as key challenge for Kosovo. Please find this analysis here.
As an in-depth preparation for the Prishtina HeatSave project, international and local field experts have made a lot of effort and analysis of the project activities, to achieve the best possible results.
Detailed site survey is done in every substation and building, to provide us all the necessary information about the system, pumps, pipes, radiators, vents and raisers of that system.
Based on those studies, we developed a plan a more efficient district heating system, bringing to the customers the latest technology and ensuring they have full control and transparency over their heating costs.
Further studies will be conducted during the entire project implementation, both before installation starts in May 2022 as well as after, to ensure proper monitoring of results. We appreciate the support of TERMOKOS costumers for our survey teams.
Most of surveyors will consist of female and male engineers and non-engineers, ensuring gender equality and diversity fulfills all the necessary standards in our society.
Experienced Termokos teams will also be present at all times, which will help our teams with their knowledge and also allow them to gather all the information about the new systems and parts installed on the substation level, staircase and apartment level too.
Proper public information will take place, to ensure everyone is informed about the new system taking place. Our teams will work closely on the field with residents to find the best timing for visiting their homes and assure them about professionalism and benefits they will get. The survey